I will do quantity takeoff electrical, mechanical and plumbing

Parte de la información aparece en idioma inglés.
5.0
5.0

Pakistán

Hablo Urdu, Inglés

6 pedidos completados

Hi, I am a civil engineer with extensive experience in the field of quantity surveying & estimation. I have done 1000+ international projects mainly in USA Construction Project. I am Using Plan swift...
Acerca de este Servicio

I am a Professional Estimation Engineer. I Have Been working as an Estimation Engineer from 2 years.


My services includes but not limited to:

  • Analyzing drawing and specifications and other documents for Electrical (Power Lighting, Grounding, Feeders & Sub-Feeders Take-off) and Auxiliary Plans (CCTV, Data & Telephone, Fire Alarm and Detection System and Public Address System).
  • Mechanical Work Takeoff Including Ducting, Supply Grills & Dampers etc.
  • Plumbing Work Takeoff including Hot & Cold Water Pipes. Sanitary Pipes & Tees Elbows
  • Prepare a detailed take off for all the materials needed using Plan Swift Software.


Why You Select Me.

I will provide:

1: Plan swift source file 

2: Excel takeoff sheet 

3: Markups plans (PDF)

 100% Client Satisfaction Guaranteed. 

Preferencia de estilo de entrega

Informa al freelancer cualquier preferencia o inquietud que tengas con respecto al uso de herramientas de IA en la finalización y/o entrega de tu pedido.

Reseñas

4 comentarios sobre este Servicio
5.0

(4)
(0)
(0)
(0)
(0)
Desglose de calificaciones
  • Nivel de comunicación del Freelancer
    5
  • Calidad de la entrega
    5
  • Valor de la entrega
    5
Ordenar por
Más relevante
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    He is a Professional Estimator, I recommend him for your project estimation

    Hasta USD50

    $

    2 días

    Tiempo

    Útil?
    No
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    He is a professional when it comes to building material take off and cost estimate, I have never had complain about his delivery I will definitely continue to work with you Thank you

    Hasta USD50

    $

    1 día

    Tiempo

    Útil?
    No
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    Trust me, You will never regret working with him He is exceptional and pay attention to details, he deliver the project just as I have requested without stressing me

    USD50-USD100

    $

    1 día

    Tiempo

    Útil?
    No
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    A fast and expert Quantity Estimator, He is a professional and pay attention to the project requirements

    USD50-USD100

    $

    3 días

    Tiempo

    Útil?
    No
Reseñas

4 comentarios sobre este Servicio
5.0

(4)
(0)
(0)
(0)
(0)
Desglose de calificaciones
  • Nivel de comunicación del Freelancer
    5
  • Calidad de la entrega
    5
  • Valor de la entrega
    5
Ordenar por
Más relevante
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    He is a Professional Estimator, I recommend him for your project estimation

    Hasta USD50

    $

    2 días

    Tiempo

    Útil?
    No
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    He is a professional when it comes to building material take off and cost estimate, I have never had complain about his delivery I will definitely continue to work with you Thank you

    Hasta USD50

    $

    1 día

    Tiempo

    Útil?
    No
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    Trust me, You will never regret working with him He is exceptional and pay attention to details, he deliver the project just as I have requested without stressing me

    USD50-USD100

    $

    1 día

    Tiempo

    Útil?
    No
  • B

    blue_elijah

    Cliente recurrente

    US

    Estados Unidos

    5

    A fast and expert Quantity Estimator, He is a professional and pay attention to the project requirements

    USD50-USD100

    $

    3 días

    Tiempo

    Útil?
    No