Francesco B

@mbb_casecoach

Associate at Mckinsey and case interview coach

Italia
Español, Inglés, Italiano
Parte de la información aparece en idioma inglés.
Sobre mí
joined McKinsey post-MBA after interviewing with all MBB firms. Completed 70+ live case interviews and, after joining McKinsey, gained deeper insight into what interviewers look for and what differentiates successful candidates. I help MBA candidates, experienced hires, candidates preparing for MBB and Tier-2 consulting interviews. Sessions include: realistic mock cases, realistic mock PEI / fit interviews, consultant-style feedback, case, PEI/ fit preparation support and best practices. My approach focuses on training candidates to meet the real interview “bar”.... Lee más

Habilidades

m
mbb_casecoach
Francesco B
desconectado • 
Tiempo medio de respuesta: 1 hora

Revisa mis servicios

Estrategia e innovación comercial
I will run a realistic mckinsey style case interview

Experiencia laboral

McKinsey_& Company

Associate

McKinsey & Company • Tiempo completo

Sep 2025 - Present8 mos

◆ Led procurement and operations workstreams across complex transformations, including RFQs, should-cost analyses, and inventory optimization programs, driving cost savings and working capital reduction.

Hitachi

Hitachi

Tiempo completo • 8 yrs 5 mos

Work Package Leader – Power Supply & Traction Power

Aug 2021 - Aug 20254 yrs

◆ Owned end-to-end definition, design, and execution of the Power Supply and Traction Power work package for large-scale turnkey rail projects: Panama Metro Line 3, Torino Linea 2 tender, and Miami Beach Corridor tender ◆ Acted as key technical interface with client, internal disciplines, and external contractors; coordinated multidisciplinary teams across geographies and oversaw subcontractors through all project phases — contracting, design, planning, manufacturing, and testing ◆ Managed planning, budget control, risk and opportunity tracking, change orders, claims, and senior management reporting — ensuring alignment with project milestones and delivery targets ◆ Led technical development of traction power, MV/LV systems, grounding & bonding system, and protection philosophy — including relay coordination, system studies, and MV interconnection management across multiple substations, ensuring compliance with IEC/IEEE standards ◆ Led multi-million dollar proposal for the Miami Beach Corridor tender, Torino Linea 2, and Panama L3 tunnel variation order, driving scope definition, technical clarification, supplier quotation analysis, risk analysis, and cost estimation under tight deadlines

Associate Power Supply & Traction Power Engineer

Mar 2017 - Aug 20214 yrs 5 mos

◆ Designed and delivered Power Supply and Traction Power systems for major international turnkey rail projects: Hurontario LRT, Copenhagen Cityringen, Bologna Linea Rossa, and Honolulu Skyline ◆ Negotiated and managed a complex subcontract with a single supplier covering full design, supply, and commissioning of 15 MV substations for the Hurontario LRT — including scope definition, schedule milestones, liquidated damages, warranty terms, and technical acceptance criteria ◆ Performed modelling and sizing of power supply & traction power systems using Trainsunner, ETAP, and Ampere simulation tools ◆ Designed MV/LV/DC substations, grounding & bonding system; ensured MV and DC protection coordination and managed MV interconnection requests for multiple substations ◆ Led on-site integrated testing and commissioning activities, coordinating international teams, suppliers, and local authorities ◆ Managed Factory Acceptance Tests (FAT) for MV switchgear, traction and auxiliary transformers, rectifiers, DC switch-disconnectors, High Speed Circuit Breakers, UPS systems, and battery chargers — ensuring compliance with IEC/IEEE standards